Mirror Chambers
KB Mirror Chamber | KB Mirror Delivery Record | Mirror Chambers for UVSOR
KB Mirror Delivery Record
Synchrotron Facility | Beamline | Completion Date | Scope of Work |
---|---|---|---|
SWISSFEL (Switzerland) | ARAMIS | November 2016 | Design and Engineering |
Manufacturing | |||
Installation | |||
Brookhaven National Laboratory (USA) | NSLS-II ISR | November 2016 | Design and Engineering |
Manufacturing | |||
Installation | |||
NSLS-II IXS | October 2013 | Design and Engineering | |
Manufacturing | |||
Installation | |||
NSRRC (Taiwan) | NSRRC BL09A | August 2010 | Design and Engineering |
Manufacturing | |||
Installation | |||
SPring-8 BL12XU | March 2008 | Design and Engineering | |
Manufacturing | |||
Installation |
Updated January 2017