Toyama logo

Beamline Frontend - Delivery record

Mask and Absorber | X-Y Slits | Screen Monitor

Synchrotron FacilityBeamlineCompletion DateEquipment Supplied
MAX IV (Sweden)5.0 GeV ring (three beamlines)Delivery in 2017Front Mask - 1
Front Mask - 2
Absorber and Beam Position Monitor
Main Mask
Water cooled Screen Monitor
Beam Shutter
MAX IV (Sweden)1.5 GeV ring (all beamlines)March 2016Front Mask - 1
Front Mask - 2
Absorber and Beam Position Monitor
Main Mask
Water cooled Screen Monitor
Beam Shutter
Saga Light Source (Japan) BL7March 2010 Absorber
Beam Shutter
Front Mask - 1
Front Mask - 2
Chamber for Vacuum Pumps
Beam Pipe through wall
Chamber for Be Window
Saga Light Source (Japan) BL10January 2009 Front Mask - 1
Front Mask - 2
Absorber and Beam Position Monitor
Main Mask
Water cooled Screen Monitor
Beam Shutter
Saga Light Source (Japan) BL11 January 2009 Front Mask - 1
Front Mask - 2
Absorber and Beam Stopper
Beam Pipe through wall
Water cooled 4 blades Slit
PF-AR Storage Ring (Japan) AR-NE3 July 2008 Layout
Water cooled Mask
X-Y Slits
SPring-8 (Japan) BL12XU March 2008 X-Y Slit
Fixed Mask
Absorber
Front Slit

Updated January 2017

© 2011-2017 Toyama|Sitemap|Privacy Japanese|Back to top|Print this page